Assessment findings were recorded through a mobile iEHS® survey tool that provided the client with real-time results and meaningful analysis. “RiskRight EHS is a philosophy [ ... ]
Read moreCase Studies
The program was developed in 4 modules: 1. Emergency Plan and First Aid, 2. Save water, energy and solid waste, 3. Transportation and 4. Good Habits. In total, 38 families of Antea [ ... ]
Read moreSpecifically, we have been supporting Cummins (an Antea USA client) with the preliminary analysis of the Colombian HSE regulatory requirements, the issuing of technical and legal e [ ... ]
Read moreAntea Group is working together with Inogen’s partner in Italy. The project started in July 2014 and consists of program management and reporting, selection and appointment [ ... ]
Read moreAntea Group Belgium has also been working on the environmental impact assessment for the Flemish part of the project since that time. Initially, work on this project consisted in p [ ... ]
Read moreThe development of the local intercommunal urbanism plan will strengthen the coherence of public policies and the private operators in a region in need of new economic prosperity. [ ... ]
Read moreAntea Group’s Ka-Lung To is involved as a consulting engineer, overseeing many different aspects of the project and advising on the various matters that need to be taken into acc [ ... ]
Read moreThe measurements performed on the storm surge barriers are the most complex deformation measurements possible, and they are therefore a great challenge for us. Aside from that, the [ ... ]
Read moreThis project was funded under the 10th European Development Fund. The overall goal is to improve the living conditions and the health of populations in rural and semi-urban areas. [ ... ]
Read moreFinal testing of this system is currently taking place at a test site in Purmerend. The method of introducing the stabilizer into the dike is being tested at length, and the techni [ ... ]
Read more